| 1 |
Application of a formal methodology during the design phase (DO254,
COCISPER, …). |
|
| 2 |
Existence of a subcontractor control plan (participants in the project).
|
|
| 3 |
The subcontractor control plan covers all participants in the project
(control over the entire life cycle). |
|
| 4 |
Selection of subcontractors with experience in the target technology,
functions and complexity level. |
|
| 5 |
Selection of experienced subcontractors to take account of the complexity
of the industrial organisation of the project. |
|
| 6 |
Formal control (with reviews) by the design centre over subcontractors
(founder, assembler and "test house"). |
|
| 7 |
Industrial organisation used in the past. |
|
| 8 |
No subcontractor with poor feedback from operations. |
|
| 9 |
Use of a mature non-aging technology. |
|
| 10 |
Use of Wafer annealing. |
|
| 11 |
Functional test of the ASIC at 3 temperatures. |
|